Our Solution

Preventive Maintenance

  • 115kV Substation AIS / GIS
  1. Test AIS or GIS
  2. Test Protection Relay
  3. Test Transformer
  4. Test CT / PT

(ABB, HITACHI , SIEMENS , Schneider)


  • 3kV - 33kV Medium Switchgear Panel
  1. Test Vacuum Circuit Breaker
  2. Test Protection Relay
  3. Test CT / PT
  4. Test Digital Meter

(ABB , Schneider , Siemens, LS, FUJI)


  • MV Inverter (3kV - 11kV)
  1. PM MV Drives
  2. PM Drytype Transformer

(LSIS, HITACHI, SIEMENS, INOVANCE, STEP, INVT)


  • LV Drive (220Vac - 690Vac)
  1. PM Single Drives
  2. PM Multi-Drives
  3. PM Matrix-Inverter

(ABB,Schneider,Siemens,Danfoss,Fuji, Yaskawa)


AVR Control Generator

Replace AVR for Improve your Generator Reliable

  • Replace AVR for exsiting Generator
  1. Replace AVR
  2. Rewiring Control Circuit for AVR Control
  3. Tuning AVR
  4. Connect AVR with SCADAs in Control Room

SCADAs System

Automation Control Center for Hi-technology Industry