Preventive Maintenance MVD "Hitachi" at Sugar Factory

Last updated: 28 Jun 2024
129 Views

Preventive Maintenance MV Drives "Hitachi"

Detail as :

Panel Housing (Power Cell and Tr. Panel).
- Visual inspection check.
- Cleaning housing (inner/Outer).
- Cleaning or Changing the dust filters.
- Preparation submits service data report and photography report

MV. Dry Type Transformer.
- Visual inspection check.
- Cleaning housing (inner/Outer).
- Recheck connection point (Power/Control)
- Insulation Resistance Test (IR).
- Polarization Index Test (PI).
- Preparation submits service data report and photography report


Power Cell Modules.
- Visual inspection check.
- Cleaning housing (inner/Outer).
- Recheck connection point (Power/Control)
- Messurement SCR , IGBT and Power Semi Fuse value.
- Preparation submits service data report and photography report
CT, PT and Groung cable loop.
- Visual inspection check.
- Recheck connection points.
- Recheck necessories components in loop.
- Some changing cable terminal format.
- Preparation submits service data report and photography report
History Recording.
- Recheck by M-Tool program.


Related Content
Preventive Maintenance AFE Inverter "VACON"
Preventive Maintenance AFE Inverter "VACON"
Preventive Maintenance Liquid Starter Cabinet
Preventive Maintenance Liquid Starter Cabinet
Preventive Maintenance Substation 115kV
Preventive Maintenance Substation 115kV
เว็บไซต์นี้มีการใช้งานคุกกี้ เพื่อเพิ่มประสิทธิภาพและประสบการณ์ที่ดีในการใช้งานเว็บไซต์ของท่าน ท่านสามารถอ่านรายละเอียดเพิ่มเติมได้ที่ นโยบายความเป็นส่วนตัว and นโยบายคุกกี้
Compare product
0/4
Remove all
Compare
Powered By MakeWebEasy Logo MakeWebEasy